The development of South Pars Phase 11 stands as one of Iran’s most ambitious national energy projects. Located in one of the deepest and most complex areas of the Persian Gulf, this phase demands advanced subsea technologies and highly skilled offshore engineering teams. A major portion of the project’s challenges lies in the subsea operations, which are critical to the long-term success and safety of the field.
Importance of Subsea Operations in Gas Field Development
Subsea operations form the backbone of offshore gas development. They are essential not only for the installation and maintenance of critical infrastructure, but also for ensuring safety, operational efficiency, and the longevity of offshore assets.
In Phase 11, precise installation and inspection of subsea pipelines, platform foundations, and subsea structures play a vital role in maintaining stable production and minimizing operational risks.
Key Challenges in South Pars Phase 11 Subsea Works
1. Depth and Environmental Conditions
The extreme depth and high pressure of the Persian Gulf waters present significant challenges for subsea operations. Strong currents, limited visibility, and high corrosion potential increase the complexity of every underwater mission.
2. Safety and Environmental Constraints
Beyond technical limitations, maintaining diver safety and minimizing environmental impact are top priorities. Each task must be carefully planned to comply with international safety and environmental standards.
3. Heavy Equipment Installation
Another major challenge lies in installing heavy subsea components under challenging conditions. This phase requires the use of DP2 vessels, high-capacity offshore cranes, and close coordination between engineering, diving, and marine operation teams.
The Role of ROV Technology in Phase 11
The implementation of ROV (Remotely Operated Vehicle) systems has been a game-changer in the Phase 11 subsea operations. ROVs enable:
-
Real-time underwater inspections and condition monitoring
-
Support for commercial divers in deep-water missions
-
Data collection and defect detection in hazardous environments
By integrating ROV technology, project teams are able to minimize human risk while improving accuracy and operational speed.
Commercial Diving and Mixed-Gas Systems
Due to the depth and working conditions in Phase 11, mixed-gas diving systems are essential. These advanced breathing mixtures allow divers to perform safely at depths exceeding 60 meters while maintaining focus and efficiency.
Kalout Marine Engineering Company, leveraging years of experience in deep-water projects, successfully executed several mixed-gas diving operations during the Phase 11 development — ensuring precision, safety, and compliance with global standards.
Kalout’s Experience in National Offshore Projects
As a specialized subsea and offshore engineering contractor, Kalout Marine Engineering has participated in numerous national projects across the Persian Gulf.
In the Phase 11 project, Kalout provided services including:
-
Subsea installation and repair works
-
NDT inspections and cathodic protection replacement
-
ROV-based leak detection and pipeline monitoring
🔗 Explore more of our subsea and diving projects:
👉 Marine Diving and Offshore Projects
Conclusion
South Pars Phase 11 is a symbol of Iran’s technical capability and determination in the offshore gas sector. Despite the inherent challenges of subsea work in deep and dynamic environments, the use of modern technology, ROV systems, and professional diving teams has paved the way for successful and sustainable field development.
With proven expertise in deep-water operations and a strong commitment to safety, Kalout Marine Engineering continues to play a vital role in advancing Iran’s offshore energy infrastructure.